Submarine cable — a specialized practice built on three decades of Pacific Northwest subsea experience.
Submarine cable is a specialized practice at Waveguide Networks. Over 24 years of business — and on the strength of work that goes back to the late 1990s — we've supported high-stakes subsea projects across the Pacific Northwest and beyond.
The work draws on the company's full splicing and testing capability applied under the most demanding field conditions: tidal shore landings, armor design for treacherous channels, vault termination engineering, and fault location.
What we do
Subsea fault location and repair consulting — pinpointing faults, evaluating shore landings, advising on repair execution
Subsea-to-land splice engineering — vault termination, fiber transition from submarine armor to land cable
Submarine cable supply — sourcing armor-class power and fiber cable through our partnership with HengTong Cable Group
Path engineering and armor specification — route assessment, burial planning, armor class selection for the conditions
Commissioning and acceptance testing — fusion splicing of submarine fiber under field conditions, OTDR and end-to-end verification
The HengTong partnership
Waveguide's relationship with HengTong Cable Group began with a specific engineering need. The San Juan ↔ Lopez submarine cable route, between two islands in the San Juan archipelago, runs through some of the most challenging subsea conditions in the Pacific Northwest. The cable required armor designed for those conditions — and HengTong was willing to develop, with Waveguide, a custom rock-armor / quad-armor specification capable of withstanding the route's tidal currents, seabed terrain, and marine activity.
That partnership has continued across multiple subsea power cable projects, including the Port of Seattle Terminal 46 (26.4kV) and Snohomish County PUD Hat Island (12.47kV) deliveries.
Submarine cable field photo
Subsea-to-land splice vault termination at a San Juan Islands shore landing
Selected projects
San Juan ↔ Lopez Submarine Cable — Pirelli install (1999) and CenturyLink emergency restoration (2013)
The San Juan ↔ Lopez submarine cable was originally installed by Mark Jacobson in 1999 during his 13-year tenure with Pirelli Jacobson Inc. — the family submarine cable business (originally Jacobson Brothers) acquired by Pirelli Cavi SpA in the mid-1980s, where Mark worked across multiple Pirelli Cavi divisions on submarine cable projects worldwide. When the San Juan ↔ Lopez cable failed in 2013, CenturyLink engaged Waveguide Networks for the emergency restoration — and Waveguide responded on a cable Mark had personally laid 14 years earlier.
The repair used a refitted subsea splice that Mark had originally engineered during the Pirelli Jacobson era, recovered for the project from Sound Ocean Systems Inc., the subcontractor it had been on loan to since the company closed circa 2004. A piece of submarine cable splice hardware engineered for that route returned, nine years later, to rescue the very cable it was built for.
This project also originated Waveguide's partnership with HengTong Cable Group — developed specifically to engineer the custom rock-armor / quad-armor cable specification capable of withstanding the route's tidal currents and seabed terrain.
Four years after the 2013 emergency restoration, CenturyLink returned to replace the cable outright with the custom rock-armor / quad-armor specification that the 2013 work had originated. Waveguide Networks and HengTong Cable Group supplied the replacement cable — the first production deployment of an armor specification engineered specifically for the conditions that had failed the original Pirelli-era cable.
Furukawa / JF Brennan — San Juan Island cable landing vault
For the Japanese cable manufacturer Furukawa, working in partnership with JF Brennan and Fuqua Corporation, Waveguide engineered the cable landing vault on San Juan Island and designed a specialized solution for splicing the submarine cable fibers to the land-side cable. This project was a direct application of Waveguide's splicing engineering — the everyday discipline of the field team — applied at the demanding boundary between subsea and terrestrial infrastructure.
Port of Seattle Terminal 46 — 26.4kV submarine power cable
Submarine power cable supply for the Port of Seattle's Terminal 46 infrastructure, delivered in partnership with HengTong Cable Group. Cable engineered to Port of Seattle specification and delivered for marine deployment.
Snohomish County PUD Hat Island — 12.47kV submarine power cable
Submarine power cable supply for SnoPUD's Hat Island infrastructure (RFP 23-1411-BP), in partnership with HengTong. Cable delivered December 2025. Installation monitoring is scheduled for February 2027. Timothy Mullins performed the final fiber test before the cable was handed over to SnoPUD.
St. Thomas → private Caribbean island — subsea fault location
Recent international consulting engagement: subsea fault location and repair consulting for the fiber cable serving a private island owner in the U.S. Virgin Islands. The cable was faulted on the shore landing; Waveguide supported fault identification and advised on the repair execution.
Talk to us about a subsea project
Submarine cable work is led personally by founder Mark Jacobson, whose subsea experience predates Waveguide Networks itself — 38 years across subsea and fiber optic infrastructure.